I have been busy doing all the little things on our Casita since most of the major stuff is done. We are about ready to call for final inspection except the plumber messed up and forgot to plumb the water heater pressure relief valve to the outside. Also it needs a pan under the water heater. The electrical got done yesterday and it all works well.



I spent over an hour today just to hang a toilet paper holder. The reason why is because I kept getting interrupted by friends coming by. Not really a problem though.
Before we returned from Las Vegas, I ran the car in to the Saturn dealer to get an estimate on the bodywork. It came to around $3500. When we got back to Havasu I got a local estimate. That one comes to $2900. I gave then the go ahead and they will be picking up the car on Monday. Hopefully it won’t take long since that is our only car.
I posted our photos from the last 2 NASCAR races. Check down the left column and click on the thumbnail titled 2009 NASCAR.



I spent over an hour today just to hang a toilet paper holder. The reason why is because I kept getting interrupted by friends coming by. Not really a problem though.
Before we returned from Las Vegas, I ran the car in to the Saturn dealer to get an estimate on the bodywork. It came to around $3500. When we got back to Havasu I got a local estimate. That one comes to $2900. I gave then the go ahead and they will be picking up the car on Monday. Hopefully it won’t take long since that is our only car.
I posted our photos from the last 2 NASCAR races. Check down the left column and click on the thumbnail titled 2009 NASCAR.
No comments:
Post a Comment